§ 13.00.1730. Reconnection following violations; conditions; cost reimbursement.  


Latest version.
  • Whenever an industrial connection sewer has been disconnected from the public sewer by the city engineer for failure to comply with the provisions of this chapter, reconnection shall be made only upon issuance of a permit as elsewhere in this chapter provided. Before such permit is issued, the applicant shall reimburse the city for the cost of the disconnection made, and the city engineer may require the installation of a manhole for the purpose of measuring the flow, or for making periodic tests of the wastes from such connection.

(Ord. No. 14(1989), § 2(20.32.680), 6-27-89)